mobile icon
sprachwahl

Archive


06.07.2015 The logical approach: PASCHAL has now expanded its flexible (wall) formwork system LOGO.3 with the LOGO.S system
17.06.2015 Sewage purification plant in Grevenmacher, Luxembourg will be cast with PASCHAL formwork systems.
03.06.2015 Three PASCHAL systems at a large industrial construction site
15.05.2015 651 metres of coastal protection in Algeria.
30.04.2015 Underwater parking garagewith 500 parking spaces and an event area at ground level in fair-faced concrete quality
15.04.2015 PASCHAL-Plan light PPL 10.0 further optimised
01.04.2015 Multi-purpose room at Erich Kästner School with no corners and edges
04.03.2015 A major feat: GASS shoring system for Berlin residential complex
06.02.2015 New agricultural building over 14 ha
13.01.2015 Waste to be converted into electricity and district heating – Amager Bakke, Copenhagen
10.12.2014 Strasbourg gets another clinic
04.11.2014 PASCHAL presents innovative concrete formwork and support systems with high return on investment.
03.11.2014 Practical system expansion increases the unbeatable cost-benefit ratio of "evergreen's" Modular formwork even further
06.10.2014 Dynamic fair-faced concrete structure built with LOGO.3 formwork and supported with GASS shoring system
08.09.2014 Great sportsmanship is shown on the construction site of the Santander Foals Campus
20.08.2014 Spectacular concrete constructions
15.07.2014 Shaft formwork made easy with the LOGO.3 dismantling inside corner post
16.06.2014 PASCHAL – 50 years of formwork expertise in concrete construction
06.05.2014 Technical college with three-field sports hall in Holzkirchen
04.04.2014 A new "pearl" for the Black Forest's growing tourist sector
10.03.2014 PASCHAL-Circular formwork for a patient wing with architectural sophistication
14.02.2014 ERP Rental – Rental software for formwork
13.02.2014 On-the-spot safety with the LOGO wall formwork
11.02.2014 Circular formwork shapes streamlined structural components

Newsletter

PASCHAL Newsletter